A lender's renewal letter starts the update
In 2023 your firm valued a warehouse at 418 Harbour Street in Port Alder for a lender. The loan is up for renewal, and the lender's letter asks for the report to be brought to today. In this example the firm is Harbour & Finch Appraisals, and the firm, the property and the figures are invented.
The 2023 report is open on one screen and the 2023 workbook on the other. You look up each comparable again, retype dates and prices, redraw the chart, and read every page for a sentence that has gone out of date. Most of it is copying facts from one file to another by hand.
Work from a prior report takes the job's files and what has changed, plans the update the way your firm did it last time, and does the copying. At each question that is yours to answer, it stops and asks.
Pellucis reads every file you drop into the job
Drop in everything the job has. In this example that is the signed 2023 report, the 2023 sales workbook, the lender's letter, the title search and the correspondence. Pellucis puts each file in the job's folders and says what it read from it.

It plans the update the way your firm did it in 2023
Pellucis reads the signed report and lays out a plan from it. You see your headings in your order, the parts under each, and the approach your firm used. Then you tell it what is different, in your own words.
In this example the appraiser types "Same as 2023, but add the income approach." The income approach joins the plan after direct comparison. You can move a heading or add one, and save the plan as a playbook for your firm's next update. Nothing runs until you start it.

It stops at each question only you can answer
Start the plan and Pellucis works through it in order, showing what is done, what is working and what is waiting. When a step needs judgement, it stops and asks you.
In this example the city's records show a 2025 rezoning, from M-1 Light Industrial to M-2 General Industrial. The 2023 report concluded continued use as a warehouse. Pellucis asks whether the rezoning changes highest and best use, and cites the bylaw.
While you think it over, Pellucis looks for comparables under both readings and reads the rent roll. It writes nothing into the workbook or the report until you answer.
Your 2023 comparables are checked against the job's sale records
Pellucis checks each 2023 comparable against the sale and transfer records in the job. It searches for sales since 2023 the way your firm chose them last time, and where a sale no longer fits, it says why.
In this example one of the 2023 sales, 7 Tannery Way, sold again in October 2025. Pellucis shows you both sales and leaves the choice with you.
The workbook is rebuilt in your own layout
Pellucis rebuilds the comparables workbook from the 2023 one. Your sheets, columns and chart stay as they were, with today's sales in them, so your formulas stay live in Excel.
It drafts an adjustment for each of today's sales, each with its source. The time adjustment is drafted from sales and resales up to the new effective date, and the 2023 rate is left behind. You accept each adjustment or change it. Once you have, the workbook shows the adjusted range, in this example $195 to $204 per square foot.
The vacancy rate and the average net rent have both moved since 2023. Pellucis asks you to check each one before it drafts, and shows the cell and the page it came from.

Each out-of-date sentence is changed in your template, tracked
Pellucis then makes the changes in your Word template, with your letterhead, your headings and your usual wording. It changes the words that need to change and leaves the rest as your firm wrote it.
Each figure in the text is tied to its cell in the workbook, and the chart in the report is the chart in the workbook. Each change from 2023 is a tracked change that names its source, with the old words struck through. The tracked copy goes in your workfile. The report you issue is clean, with its own section on what changed.
| What you give | What comes back |
|---|---|
| The signed report, in Word | The same report in your template, each change tracked |
| Its workbook, in Excel | Your sheets, columns and chart, with today's sales |
| The job's files | Each one filed, read and cited where it is used |
| The lender's letter | The questions that are yours to answer, each with what Pellucis found |

One screen shows what is done and what needs you
Before you read the draft page by page, the review sets out the whole update. In this example 38 changes are drafted and tracked, for you to accept or reject. They include the dates, the market figures from your workbook, the sales chart and the area map. Six parts are left as you wrote them, for you to read and confirm.
Three changes need your judgement. They are the new effective date, the resale of 7 Tannery Way and the rezoning to M-2. For each one you accept the change, or open the section and write it yourself.

You conclude the value and sign
You inspect the property again, answer the open questions, go through the tracked changes, conclude the value and sign. The decisions you made are listed beside the report for the workfile.

Start from a report your firm has signed
Start a job and choose a report your firm has signed. Add its workbook and the new files, then say what has changed.
Request a demo to see Pellucis update a report from your own prior file.
Request a demo